Sweetwater 2 Data Center

IREN Limited IREN
AI Cloud Colocation Build-To-Suit
Status
Under development
First energized
Projected timeline
Late 2027
Grid connected
Yes
Coordinates
Pro

IREN's Sweetwater 2 data center in Texas, USA is an AI/HPC facility with 600 MW under development, projected for late 2027.

Energized

Sign in

Under Development

Sign in

Pipeline

Sign in

Figures shown as gross (total-facility) capacity · last updated Jul 07, 2026

This site discloses gross (total-facility) capacity, not critical IT load, not directly comparable to critical-IT sites.

Sweetwater 2 Capacity Over Time

Change log

No capacity history recorded yet.