Badajoz Data Center
- Status
- Pipeline
- First energized
- —
- Projected timeline
- 2028+
- Grid connected
- Yes
- Coordinates
- Pro
IREN's Badajoz data center in Badajoz, Extremadura, Spain is an AI/HPC data center. As of the 2026-08-27 observation, 0 MW is energized, 0 MW is under development, and 300 MW is in the pipeline for a total planned capacity of 300 MW. The site was acquired through the Nostrum Group acquisition completed in June 2026, with design and procurement planning underway and scheduled in the 2028+ cohort.
Figures shown as gross (total-facility) capacity · last updated Sep 11, 2026
This site discloses gross (total-facility) capacity, not critical IT load, not directly comparable to critical-IT sites.
Badajoz Capacity Over Time
Change log
No capacity history recorded yet.
More IREN Limited AI Data Centers
-
Childress Data Center
Texas, USA
-
Prince George Data Center
British Columbia, Canada
-
Mackenzie Data Center
British Columbia, Canada
-
Canal Flats Data Center
British Columbia, Canada
-
Sweetwater 1 Data Center
Texas, USA
-
Sweetwater 2 Data Center
Texas, USA
-
Kiowa Data Center
Kiowa, Oklahoma, USA
-
Bundey Data Center
Bundey, South Australia, Australia