Badajoz Data Center

IREN Limited IREN
AI Cloud
Status
Pipeline
First energized
Projected timeline
2028+
Grid connected
Yes
Coordinates
Pro

IREN's Badajoz data center in Badajoz, Extremadura, Spain is an AI/HPC data center. As of the 2026-08-27 observation, 0 MW is energized, 0 MW is under development, and 300 MW is in the pipeline for a total planned capacity of 300 MW. The site was acquired through the Nostrum Group acquisition completed in June 2026, with design and procurement planning underway and scheduled in the 2028+ cohort.

Energized

Sign in

Under Development

Sign in

Pipeline

Sign in

Figures shown as gross (total-facility) capacity · last updated Sep 11, 2026

This site discloses gross (total-facility) capacity, not critical IT load, not directly comparable to critical-IT sites.

Badajoz Capacity Over Time

Change log

No capacity history recorded yet.