Scrub dated satellite timelines of every covered AI data center
campus, paired with the disclosed capacity status on each date.
Included with Ziven Professional and API memberships.
Drag the slider to wipe between two dated satellite captures — open
Texas ranchland in August 2020 becomes a hyperscale AI data center
campus by July 2025. Ziven Professional and API members can scrub the
full dated timeline like this for every covered site, and compare any
two captures side by side with the disclosed capacity status on each
date.
Aug 2020Jul 2025
In development: know what every building is
We're mapping every building on each covered campus, with its disclosed
capacity and the date it first shows up on satellite. Here's a preview
on the July 2025 Childress capture, labelled from IREN's own site plan:
Calvert 1, 2, & 3 has energized capacity. It was first energized in Feb 2026.
Core Scientific, Inc. (CORZ) operates Calvert 1, 2, & 3. The site is in Kentucky, USA.
Yes. The Satellite Explorer shows dated satellite captures of Calvert 1, 2, & 3 next to the capacity Core Scientific, Inc. had disclosed at the time. The dated timeline is a Ziven Pro feature.
The Calvert 1, 2, & 3 Site Details page lists the capacity changes Core Scientific, Inc. has disclosed for the site. The full sourced change log is a Ziven Pro feature.