River Bend Campus Data Center

Hut 8 Corp. HUT
AI Cloud Colocation
Status
Under development
First energized
Projected timeline
Initial energization Q1 2027
Grid connected
Coordinates
Pro

HUT's River Bend Campus data center in Louisiana, USA is an AI/HPC facility. It has no energized capacity, with 330 MW under development and 1350 MW in pipeline. Initial energization is projected for Q1 2027.

Energized

Sign in

Under Development

Sign in

Pipeline

Sign in

Figures shown as gross (total-facility) capacity · last updated Jul 07, 2026

This site discloses gross (total-facility) capacity, not critical IT load, not directly comparable to critical-IT sites.

River Bend Campus Capacity Over Time

Change log

No capacity history recorded yet.