Cottonwood 1 & 2 Data Center

Core Scientific, Inc. CORZ
Colocation
Status
Operational
First energized
Apr 2026
Projected timeline
Grid connected
Coordinates
Pro

CORZ's Cottonwood 1 & 2 data center in Texas, USA is an AI/HPC data center with 300 MW energized as of the 2026-04-23 observation.

Energized

Sign in

Under Development

Sign in

Pipeline

Sign in

Figures shown as gross (total-facility) capacity · last updated Jul 07, 2026

This site discloses gross (total-facility) capacity, not critical IT load, not directly comparable to critical-IT sites.

Cottonwood 1 & 2 Capacity Over Time

Change log

No capacity history recorded yet.