- Energized
- Under development
- Potential
- First energized
- —
- PUE
- Cooling
- —
Updated
Hood County Capacity Over Time
Change log
Professional feature
The sourced capacity change history is part of Professional.
Already have an account?
Sign in
Hood County Data Center FAQ
Big Digital Energy, Inc. (BGDE) operates the Hood County Data Center in Hood County, Texas, USA. Ziven tracks the site's energized, under development and potential capacity from Big Digital Energy, Inc.'s own disclosures, such as filings, press releases and earnings calls.
The Hood County Data Center, operated by Big Digital Energy, Inc. (BGDE), is classed as Potential. Potential means the company has secured or contracted grid or substation power for the site, but construction has not started, even if a lease is signed. Ziven has tracked Big Digital Energy, Inc.'s capacity disclosures for the site since 2026.
Ziven classes the Hood County Data Center, operated by Big Digital Energy, Inc. (BGDE), under the Colocation data center type. Ziven assigns the type from Big Digital Energy, Inc.'s disclosures on how the site's capacity is used or sold. The site has a grid connection.
Yes. Ziven's Satellite Explorer pairs dated satellite captures of the Hood County Data Center, operated by Big Digital Energy, Inc. (BGDE), with the capacity Big Digital Energy, Inc. had disclosed at each date, so construction can be followed over time. The Satellite Explorer is available with Ziven Professional and API memberships.